Sine 2012, We have been specialized in only Marble

How to Install Tile on Wooden Stairs

by:Afaithstone     2020-10-11
If the stairs are solid, flat and horizontal, you can install tiles on the wooden stairs.The stairs must also be stable enough to withstand the weight of the tiles.These four criteria must be met before the tiling process is started.If the stairs are solid and are able to withstand the weight of the tiles but cannot be leveled, you can install a subThe floor cement board creates a smooth and flat surface.The installation of cement slabs is also used to stabilize wooden stairs.Prepare wooden stairs and surrounding areas for tile installation.Remove decorations, carpets, or other items from the stairwell area.Place the decoration in a safe position.Remove nails, staples, or nails from wooden stairs and the corresponding walls that remove the decorations.Check if there are holes and cracks in each step.Fill holes and cracks with wood putty.Let the putty dry for 60 minutes and then form a smooth surface with sand.Cut the nose plate from the front of each step.The nose plate is part of the step tread and extends to the vertical back plate or riser of each step.Flush the nose plate with the riser using a clamp saw or a circular saw.Polish the cutting area to a smooth and flat working surface.First polish with a Sander and then hand polish with sandpaper.Remove the sanding dust and other sundries on the steps.Sweep the area and wipe each step with a damp cloth or sponge.Start with the wooden steps at the top and go down the stairs.Start tiling on top steps and work down.Position the first tile in the center of the riser of the step or on the surface of the vertical step.Move the tiles to make the front edge even with the step tread.Place a 1/8-Inch gasket for each corner of the tile.Place the tiles on either side of the central tile.Repeat the process across rows.If required, mark the tiles at both ends and back of the first line for cutting.Remove tiles from steps.All necessary cuts.Thin, 1/8-Thin inch layerFix the adhesive on the back of the tile.Place the first tile in the center of the riser.Place a gasket in each corner.Repeat the process with the remaining blocks of the row.Fix the tiles on the tread in the same way as the tiles placed on the riser.Position the tiles so that the gap between each tile is consistent with each other.Align the front edge of the tile with the surface of the vertical tile on the riser.Cut tiles as needed.Move to the next wooden step and repeat Steps 8 to 13 until the whole set of wooden stairs are tiled.Allow the thin-Dry the adhesive 24 hours before continuing.Mix a batch of mud according to the manufacturer\'s instructions on the package.Not all the mud is mixed in the same way.The water glue ratio of the manufacturer is different.Start grouting on top steps and work down.Apply a proper amount of mud on the pedal on the step with mud floating.Disperse the mud on the surface of the tile and move it into the space between each tile.Remove excess mud with the edge of the mud float.Two steps are repeated in total.Remove excess mud from the surface of the tile.Wipe the tiles with a damp cloth or sponge.Please note that do not remove the mud from the space between the tiles.Add more mud if needed.Two steps down.Repeat steps 3 and 4 until all tiles are grout.Let the mud dry and harden for 24 hours.Wipe the surface of the tile with a damp cloth or sponge to remove the grouting film.Allow setting within 24 hours.Wipe the surface of the tile again to remove and retain the grouting film.
Custom message
暂无友情链接数据
Chat Online 编辑模式下无法使用
Chat Online inputting...
Dear there ,thank you for your kind message .We'd check and come back to you as soon as possible .Should you need any more assistance ,please add our wechat account for more timely response. Wechat:jane5125